MINING + AI & VISIONBY ZIA · NEW MEXICO Investor discussion ↗
Proposed AI compute hall concept cutaway
PROPOSED INFRASTRUCTURE / NORTH OF ARTESIA

Build the compute.
Prove the power.

The concept combines a separately operated Bitcoin mining yard with an AI data center. NMMINE’s regional service model informs the mining workstream: assess the site and power, plan equipment and cooling, coordinate installation, then monitor operations.

See the project basis ↓
01 / THE CAMPUS CONCEPT

Two facilities.
Separate operating profiles.

AI service commitments value predictable uptime. Bitcoin mining may offer a controllable load, subject to equipment controls and utility terms.

The concept keeps the facilities separate in metering, electrical protection, reliability planning, and business case. A mining curtailment strategy could help respond to power conditions, but it must be designed and contracted; it is not an assumed revenue stream or permission to interrupt service.

SITE STATUSProposed campus north of Artesia, New Mexico. Confirm parcel, serving utility, firm capacity, interconnection, delivered cost, fiber, water, permits, and construction requirements before fixing scope or schedule.
Proposed desert compute campus concept at sunset
Campus concept visualization. It is not a surveyed site, built facility, or utility-service commitment.
PROPOSED MINING YARD40 MD540 modular mining installations; final miner model and fleet count remain unselected.
PLANNED MINING LOAD44 MW40 MW container load plus 4 MW dry-cooler planning allowance.
PROPOSED AI FACILITY64 DGXFour planned blocks of 16 NVIDIA DGX B200 systems.
COMBINED CAMPUS LOAD~45.4 MWBefore shared ancillary loads and upstream losses.

Transformer basis: 40 × 2,600 kVA nameplate = 104 MVA aggregate nameplate capacity; this is not 104 MW of utility service. AI facility load is approximately 1.4 MW at an assumed PUE of 1.25. Vendor ratings, cooling, redundancy, elevation derating, and utility scope require engineering review. View the preserved full campus concept ↗

02 / REGIONAL MINING SERVICES

Start with the site
and the real costs.

NMMINE describes a grid-connected service model for existing industrial facilities in southeastern New Mexico and West Texas. Its published process starts with a facility and power review, then equipment planning, installation coordination, cooling and networking setup, and ongoing monitoring and maintenance.

Site + power review

Review service capacity, electricity cost, demand charges, wiring, cooling, available space, and likely site upgrades.

Hardware sourcing

Match miner selection and purchase timing to the project scope and the economics that the site can support.

Installation coordination

Plan electrical work, qualified contractors, equipment, cooling, networking, commissioning, and setup.

Monitoring + maintenance

Track operation, troubleshoot issues, maintain hardware, and make uptime and repair needs visible.

NMMINE map highlighting the Permian Basin across West Texas and southeastern New Mexico
Regional map published by NMMINE. The Permian Basin spans Texas and New Mexico; a specific site's service territory and available capacity still require confirmation.
POWER COSTS

Price the full bill.

Energy price alone is not an all-in rate. Include demand charges, delivery, taxes, cooling, repairs, financing, and downtime.

MINING REVENUE

Model the downside.

Bitcoin price, network difficulty, rewards, uptime, equipment efficiency, and operating costs can all change. No mining outcome is guaranteed.

SERVICE SCOPE

Grid-connected work.

NMMINE states that it installs mining hardware at grid-connected sites and does not provide generators or other power systems.

NMMINE is presented as a regional service reference. This summary does not claim a signed XCON contract, partnership, endorsement, or reserved capacity. Visit NMMINE.com ↗ · EIA: energy use in Bitcoin mining ↗

03 / WIND-FIRST ENERGY STRATEGY

Wind can shape
the energy mix.

Buy dependable power first. Develop renewable supply alongside it.

The current working scenario uses 19 reference 6.2 MW turbines—117.8 MW nameplate—as an illustrative annual-energy match for the approximately 45.4 MW campus at a 40% capacity factor. This is not a turbine order, project design, interconnection study, or continuous 45.4 MW supply. The proposed ZIA manufacturing plant would add load after its process is defined.

Compare ownership and a power purchase agreement

Study land, wind resource, transmission, interconnection, development risk, and delivered price for each route.

Model every hour

Wind output varies; annual energy matching does not guarantee supply for each hour. Include grid service, firming contracts, and storage only where justified.

Protect the critical loads

Design reliability for manufacturing and contracted AI services. Evaluate mining as interruptible only under approved service terms.

Wind turbine reference image for the proposed energy strategy
Wind reference photograph used by the working proposal; it does not depict a selected site or project.
SEPARATE CAPITAL PLANThe working proposal uses $300M as a mining and AI planning budget and a $250M illustrative wind allowance. These are not vendor quotes or validated project costs. A power purchase agreement would change the wind capital plan. Storage, major offsite upgrades, financing costs, and the undefined ZIA plant load are excluded.
04 / WHAT NEEDS TO BE PROVED

Commission in stages.
Expand on evidence.

GateEvidence before the next commitment
Site + serviceParcel control, utility study, firm capacity, upgrade cost, energization timeline, water, soils, drainage, and permits.
Power + windAll-in utility offer; wind resource and land assessment; interconnection; hourly generation and load model; comparison of PPA, ownership, and firming.
AI blockCustomer demand, server and network quotes, cooling design, fiber validation, acceptance criteria, and reliability plan.
Mining trancheMiner selection, full delivered-cost model, utility-approved curtailment controls, commissioning plan, uptime baseline, and repair strategy.
Capital + governanceProject-specific entities, ownership, use of funds, funding eligibility, incentive offers, and written allocation of shared costs.

Source basis: XCON's working investor page and campus concept; NMMINE's published service summary. This page preserves the assumptions while labeling them as proposals that require independent validation.

Power is the first diligence gate.

Review resilience questions on grid service, wind, cooling, water, and staged commissioning.

Open the resilience review ↗